Skip to: Curated Story Group 1
Visually Open Nav.
Europe
US
APAC
subscribe
Home
Sections
Sections
Building Sealing Solutions
Buinding Restoration and Maintenance
Commercial Contractors
Concretes, Aggregates and Materials
Construction Coating
Construction Consulting
Construction Demolition and Recycling
Construction Forensic and Owners Representative
Construction Interiors
Construction Staffing
Flooring Systems
Kitchen and Bath
Modular and Prefab Construction
Mould Remediation and Testing
Outdoor Construction
Pre-Construction Services
Precast Concrete
Roofing and Siding Systems
Safety and Compliance
Specialty Construction
Steel Building
Leadership Perspectives
Innovation Insights
News
Conferences
Newsletter
CXO Awards
About Us
DECEMBER 2023CONSTRUCTIONBUSINESSREVIEW.COM 19good contracts (the starting point of any claim situation), which leads to being able to reliably address complex construction claims involving such issues as acceleration, delay, claims for lost productivity, changed or unforeseen conditions, extra work, defective plans and specifications, contract suspension or termination and other performance issues.Gerber Ciano Kelly Brady LLP is also proficient at handling routine construction matters, such as mechanic's liens and bond claims. In each situation, Gerber Ciano Kelly Brady LLP adopts a problem-solving mindset, meticulously examining the intricacies of each dispute, and presenting clients with a detailed analysis. Gerber Ciano Kelly Brady LLP works to replace the conventional one-size-fits-all strategy with a tailored plan that allows clients to gain insight into several alternative paths to resolution, enabling them to take the route best suited to their needs.By way of example, Gerber Ciano Kelly Brady LLP recently assisted a client on the brink of bankruptcy as a result of nonpayment due to alleged performance issues. After thoroughly analyzing the issues, Gerber Ciano Kelly Brady LLP was able to negotiate a favorable settlement on the client's behalf. In another instance, the firm represented a general contractor in a complex arbitration against the owner. In that case, the owner presented an extensive list of claims alleging defective work. At the end of ten (10) hearing days, the firm successfully defeated all of the owner's claims and secured payment on behalf of the client. This outcome marked a drastic turn of events considering the fact that earlier settlement discussions were based upon a potential payment being made to the owner. These are but two of the many situations in which Gerber Ciano Kelly Brady LLP has successfully represented its construction clients in both the public and private sectors. We recognize the multifaceted nature of construction contract disputes. We work to help clients avoid litigation, but, if litigation does become necessary, our guidance helps our clients position themselves to be able to present the strongest case possible
<
Page 9
|
Page 11
>