Skip to: Curated Story Group 1
Visually Open Nav.
US
APAC
EUROPE
subscribe
Home
Sections
Sections
Architectural Glass
Building Restoration and Maintenance
Commercial Contractors
Concretes, Aggregates and Construction Materials
Construction Cladding
Construction Consulting
Construction Engineering Services
Construction Equipment
Construction Forensic and Owners Representative
Construction Insulation, Coating and Waterproofing
Construction Interiors
Construction Staffing
Doors and windows
Flooring System
HVAC
Kitchen and Bath
Mechanical Electrical and Plumbing
Modular and Prefab Construction
Outdoor Construction
Pre-Construction Services
Residential Construction
Roofing and Siding Systems
Specialty Construction
Wall Systems
Contributors
Vendors
News
Conferences
Newsletter
About
CXO Awards
Welcome back to this new edition of Construction Business Review !!!
✖
Sign In
Subscribe to our Weekly Newsletter to get latest updates to your inbox
DECEMBER - JANUARYCONSTRUCTIONBUSINESSREVIEW.COM8IN MYOPINIONBy Shashank Singh, Project Manager, AECOMNAVIGATING THROUGH SPACE CONSTRAINTS AND COMPLICATED SITE LOGISTICS IN RENOVATION PROJECTS, WHILE ENSURING SAFETY AND MEETING EXPECTATIONS THROUGH CONSTRUCTION TECHNOLOGYConstruction projects that include both renovation and new build scopes are intricate undertakings that demand meticulous planning, innovative solutions, and a dedication to delivering quality results. Having been involved in similar projects totaling over $400 million in value and encompassing more than 500,000 square feet of built-up space, I've gained invaluable insights from notable ventures like the Stephen F. Austin High School in Houston, Texas, and the James Bowie High School in Austin, Texas. These two projects, with budgets of $81 million and $80 million and timelines of 6 and 5 years, respectively, presented distinct challenges and opportunities. Austin High School - Navigating Limited Space and Historical Restoration:The Austin High School project presented a unique set of challenges right from the start. Situated near the bustling downtown area of Houston, the school campus occupied a relatively compact 5-acre site. This limited space within the property lines posed a significant logistical challenge when it came to material storage and deliveries. To address this issue, we implemented a sophisticated material delivery schedule, meticulously monitored by dedicated personnel. This schedule was regularly updated to accommodate any unforeseen last-minute delays stemming from supply chain issues, ensuring that construction progressed smoothly.Another standout aspect of this project was the need to relocate the school's students and staff to a nearby off-site swing space. Over 160 temporary buildings were thoughtfully designed and interconnected to house approximately 2000 students and staff throughout the construction period. This move allowed construction to proceed without disrupting the daily operations of the school.A key highlight of the Austin High School project was the restoration and renovation of the historic building on the campus, constructed in the early 1930s. This endeavor required a delicate balance between preserving the building's historical integrity and integrating modern systems to meet contemporary educational needs. It was a testament to the importance of honoring the past while embracing the future in renovation projects. Bowie High School - Overcoming Site Logistics and Ensuring Safety:In contrast to Austin High School, the Bowie High School project presented its own set of distinctive challenges. Situated on a sprawling 60-acre property on the outskirts of Austin, the project faced logistical complexities due to the ongoing occupancy of the school campus during construction. Ensuring the safety of both the school's students and staff and the construction team was of paramount importance throughout the project's duration.Shashank Singh
<
Page 7
|
Page 9
>