Skip to: Curated Story Group 1
Visually Open Nav.
US
APAC
EUROPE
subscribe
Home
Sections
Sections
Architectural Glass
Building Restoration and Maintenance
Commercial Contractors
Concretes, Aggregates and Construction Materials
Construction Cladding
Construction Consulting
Construction Engineering Services
Construction Equipment
Construction Forensic and Owners Representative
Construction Insulation, Coating and Waterproofing
Construction Interiors
Construction Staffing
Doors and windows
Flooring System
HVAC
Kitchen and Bath
Mechanical Electrical and Plumbing
Modular and Prefab Construction
Outdoor Construction
Pre-Construction Services
Residential Construction
Roofing and Siding Systems
Specialty Construction
Wall Systems
Contributors
Vendors
News
Conferences
Newsletter
About
Awards
Welcome back to this new edition of Construction Business Review !!!
✖
Sign In
Subscribe to our Weekly Newsletter to get latest updates to your inbox
MAY 2024CONSTRUCTIONBUSINESSREVIEW.COM9is typically required for lightweight concrete to meet the specified concrete weight of 90-115 PCF compared to normal-weight concrete, which is 140-150 PCF. As noted in ACI 302, Guide to Floor and Slab Construction, published by American Concrete Institute, air-entrained concrete over 3 percent should not be overly troweled or hard troweled; otherwise, the air bubbles that are created during the air entrainment process will tend to line up just below the surface of the concrete and make a weak plane that could easily debond from the concrete surface as previously described. As we continued the specification review during the meeting, we noticed that the concrete specifications call for a floor flatness of 35 (FF35). While FF35 is typical for flooring applications, to achieve an FF35, the floor must be hard-troweled, which creates a weak surface in lightweight concrete with air entrainment of over 3 percent and is unsuitable for any floor installation. It is easy to overlook the finishing needs and flatness requirements with this sequence of specified materials and understand the consequences of the installation techniques required to achieve what is specified for installation. If we had finished the concrete as specified, with an FF35, we likely would have created a path for floor failure.Offering Additional InsightsWe seldom see the consequences of how one trade affects another with regard to concrete finishing and floor installation. As a result, it is critical that this be one of the items reviewed during our quality pre-installation meetings.Through our quality program, associated processes and coordination meetings, we have developed several strategies to address these concerns with the designer and installer. We now recommend the following changes to the specifications, which help to avoid the potential for a multi-million-dollar flooring disaster:1. Use normal-weight concrete if the structure and building fire design allow.2. If lightweight concrete is required (as noted in #1), reduce the floor flatness (FF) specifications to FF20, which could be achieved with a lighter finishing technique that will not create a weak top surface. The remainder of the flatness that is required for the flooring would be made up of a thin engineered floor topping.3. If lightweight concrete is required (as noted in #1), reduce the allowed air content in the concrete slab mix design. A concrete design of a 3 percent air content maximum will increase the overall weight of the concrete to about 2 PSF (pounds per square foot) for a 6" slab and maintain a 114 PCF (pounds per cubic foot) design rather than 110 PCF.Collaborating with the designers, structural engineers, and concrete suppliers, we can change how the industry specifies lightweight concrete slabs to interact better with the down-line trades. Going through the entire construction process, including discussing the next step of construction with the stakeholders, will educate and provide a better set of job-specific specifications that work for the initial to final installations. Putting together the down-line scenario and catching issues before they become concerns is critical to a successful project. Having a quality program in place with an experienced team that can review the work before it commences benefits the project and all companies involved. Collaborating with the designers, structural engineers and concrete suppliers, we can change how the industry specifies lightweight concrete slabs to better interact with the down-line trades.
<
Page 8
|
Page 10
>