Skip to: Curated Story Group 1
Visually Open Nav.
Europe
US
APAC
subscribe
Home
Sections
Sections
Building Sealing Solutions
Buinding Restoration and Maintenance
Commercial Contractors
Concretes, Aggregates and Materials
Construction Coating
Construction Consulting
Construction Demolition and Recycling
Construction Forensic and Owners Representative
Construction Interiors
Construction Staffing
Flooring Systems
Kitchen and Bath
Modular and Prefab Construction
Mould Remediation and Testing
Outdoor Construction
Pre-Construction Services
Precast Concrete
Roofing and Siding Systems
Safety and Compliance
Specialty Construction
Steel Building
Leadership Perspectives
Innovation Insights
News
Conferences
Newsletter
CXO Awards
About Us
NOVEMBER 2023CONSTRUCTIONBUSINESSREVIEW.COM8IN MYOPINIONPareto Distribution is a phenomenon that was first discovered by Italian Economist/Civil Engineer Vilfredo Pareto In the late 19th century. Pareto discovered while observing wealth and income inequality that a small percentage of the population owned a large percentage of the wealth. In contrast, the majority of the population owned only a small percentage.Pareto's observations of wealth distribution led him to propose what is now known as the Pareto principle, or the "80/20 rule." This principle states that roughly 80% of the effects come from 20% of the causes. For example, in a business context, 80% of the profits might come from 20% of the products, or 80% of the complaints is likely to come from 20% of the customers.In the context of operational efficiency in construction, the Pareto principle can be used to identify critical factors that contribute to delays or inefficiencies in a construction project. For example, if we observe that 20% of the project activities are causing 80% of the delays, we can focus on addressing those critical activities to improve overall project efficiency.To apply the Pareto principle in construction, we must first identify the key performance indicators (KPIs) most relevant to the project's success. These KPIs could include factors such as the length of time for the submittal review process, long Ramon ParchmentPARETO PRINCIPLE AND OPERATIONAL EFFICIENCY IN CONSTRUCTION By Ramon Parchment, Mission Critical Project Manager, AECOM Tishman
<
Page 7
|
Page 9
>