CLOSE
  • MEP Canada
  • Mould Remediation and Testing Europe
  • Swimming Pool Construction APAC
  • Building Sealing Solutions Europe
  • Kitchen and Bath
  • Decking Canada
  • MEP APAC
  • Construction Saudi Arabia
  • Construction Law APAC
  • Outdoor Construction
  • Foundation Construction Canada
  • Mechanical Contractor Canada
  • Apartment and Condominium Contractors Canada
  • Cold Storage Construction APAC
  • Precast Concrete Europe
  • Construction Staffing Europe
  • Pre-Construction Services
  • Flooring System APAC
  • Scaffolding Canada
  • Swimming Pool Construction Canada
  • Construction Management Canada
  • Concretes, Aggregates and Construction Materials APAC
  • Construction Forensic and Owners Representative Europe
  • Buinding Restoration and Maintenance Europe
  • Modular and Prefab Construction Europe
  • Construction Interiors Europe
  • Outdoor Construction Europe
  • Pre-Construction Services Europe
  • Building Restoration and Maintenance Canada
  • Residential Construction
  • Concrete Canada
  • Construction Cladding APAC
  • Cold Storage Construction Canada
  • Concretes, Aggregates and Materials Europe
  • Commercial Contractors Europe
  • Commercial Contractors APAC
  • Dummy
  • Flooring Systems Europe
  • Construction Management APAC
  • Landscaping Canada
  • Construction Coating Europe
  • Construction Consulting Europe
  • Modular and Prefab Construction
  • Mechanical Electrical and Plumbing
  • Roofing and Siding Systems Europe
  • Architectural Glass APAC
  • Startups APAC
  • Forensic and Owners Representative
  • Flooring System
  • Waterproofing APAC
  • Wall Systems
  • Safety and Compliance Europe
  • Construction Engineering Services
  • Construction Bidding and Auctions
  • Architectural Glass
  • Construction MENA
  • Construction Demolition and Recycling Europe
  • Construction Interiors
  • Kitchen and Bath Europe
  • Steel Building APAC
  • HVAC
  • Doors and windows
  • Roofing and Siding Systems
  • Construction Marketing
  • Insulation, Coating and Waterproofing
  • Building Information Modeling APAC
  • Sustainable Construction APAC
  • Building Restoration and Maintenance
  • Commercial Contractors
  • Specialty Construction
  • Construction Engineering Canada
  • Construction Engineering MENA
  • Modular Construction Canada
  • Modular Construction APAC
  • Specialty Construction Europe
  • Construction Latam
  • Workforce Management and Staffing
  • Roofing Systems APAC
  • Construction Consulting
  • Steel Building Europe
  • Construction Demolition and Recycling APAC
  • Safety and Compliance APAC
  • Concretes, Aggregates and Materials
  • Architecture and Design Services
Skip to: Curated Story Group 1
Construction Business Review
US
EUROPE
APAC
CANADA
MENA
LATAM
AUSTRALIA

Advertise

with us

  • Europe
    • US
    • EUROPE
    • APAC
    • CANADA
    • LATAM
    • AUSTRALIA
  • Home
  • Sections
    Building Sealing Solutions
    Buinding Restoration and Maintenance
    Commercial Contractors
    Concretes, Aggregates and Materials
    Construction Coating
    Construction Consulting
    Construction Demolition and Recycling
    Construction Forensic and Owners Representative
    Construction Interiors
    Construction Staffing
    Flooring Systems
    Kitchen and Bath
    Modular and Prefab Construction
    Mould Remediation and Testing
    Outdoor Construction
    Pre-Construction Services
    Precast Concrete
    Roofing and Siding Systems
    Safety and Compliance
    Specialty Construction
    Steel Building
  • Leadership Perspectives
  • Build Strategies
  • News
  • Conferences
  • CXO Awards
  • About Us

Thank you for Subscribing to Construction Business Review Weekly Brief

  • Home
  • Leadership Perspectives

A featured contribution from Leadership Perspectives: a curated forum reserved for leaders nominated by our subscribers and vetted by the Construction

Vice President

Sevak Demirdjian

Accelerated Bridge Construction Techniques Using Prefabricated and Pre-Assembled Structural Systems

ABC Techniques have been used by SNC-Lavalin engineers throughout the years to ensure world-class bridge construction.


Rationale for Implementing ABC Techniques for a Sustainable Bridge Construction


ABC Techniques have been used by SNC-Lavalin engineers throughout the years to ensure world-class bridge construction. Accelerated techniques for bridge construction should be used where the benefits have effects on the construction costs. This modern technology was used to implement innovative planning, design, materials, and construction methods in a safe and cost-effective manner to reduce on-site construction. Decisions to use accelerated bridge construction techniques are made after considering the specific factors, mainly temporary roadways, temporary retaining structures, environmental impacts, sustainable development, user costs, social and financial prerogatives, long detours, and means and methods. The author has selected in this article, several structures where innovation and sustainability are paramount. Two major project applications are presented. The first consists of a new construction for two projects: an elevated roundabout and the new Champlain Bridge. The second describes the reconstruction of a footbridge and the replacement of bridge decks through different structural techniques.


Construction of an Elevated Roundabout


This is a complex geometry project located in a highly urbanized area. The project includes the relocation of public utilities, demolition of existing structures, construction of new structures and new roadways, and preparation of temporary roads and alternate itineraries for highway traffic, public transport, and pedestrian traffic. The elevated structure was constructed over a major highway in phases to maintain traffic flow.


Construction of a Footbridge


The construction entails the replacement of an existing footbridge. The ABC technique was implemented, which comprises HPC precast pre-stressed elements offering the most economical solution. The bridge spans 35m. The cross-section consists of two Z-shaped pre-cast girders with the shape providing a bottom ledge for supporting the pre-cast panels for the deck slab.


Reconstruction of the Jacqus-Cartier Bridge Deck Replacement–Integral Deck Floating System


Measuring 2.70 km span crossing a major river, with five lanes of traffic, this bridge carries more than 43 million vehicles every year, making it one of the busiest bridges in North America on a per lane basis. The ABC Technique for deck replacement was developed based on the following main objectives:


• Minimize inconveniences to as many users as possible


• Construct a highly durable deck (design service life greater than 50 years)


• Minimize negative impacts on the environment


Reconstruction Of Princess Margaret Bridge–Intergral Deck, Composite Action The Princess Margaret Bridge provides an elevated crossing over a major river, measuring 1097 m in overall length. It is a high-level structure supported on tall, slender piers to provide the required 23± m clearance for the center navigation span. The roadway is supported by nine deck truss spans, one through-truss navigation span, seven Plate Girder spans, and six Rolled Beam approach spans.


A composite section was created between the deck slab and the steel members. This composite action tremendously improved the capacity of those members and therefore reduced the need for strengthening.


Composite actions were created between the deck panels and top chord steel truss. The composite actions to the steel members were achieved through a spine beam that was detailed to connect either the Plate Girder top flange or the Deck Truss top chord to the deck panels after the post-tensioning operations.


New Champlain Bridge Corridor Crossing The St-Lawrence River


On October 5, 2011, the Government of Canada announced the replacement of the Champlain Bridge, one of the busiest crossings in Canada, carrying between 40 and 50 million vehicles per year.


The asymmetric, cable-stayed bridge features a 155-meter-high concrete tower and stay cables in a harp arrangement, an aesthetic element that designers felt would bolster the bridge’s place amongst the architecture of the cityscape. The three-corridor design of the project includes two three-lane roadways, a multi-use path for pedestrians and cyclists, as well as a two-lane transit artery that will accommodate a light-rail system. The overall construction timeline was a tight 42 months, which made for an accelerated schedule. Consequently, pre-cast elements played a major role in project planning and execution. Offsite pre-fabrication took some pressure off the on-site construction teams so that crews could focus more directly on other construction components. Heavy gravity-based footing and pier starters for in-water approach spans with units weighing 800 to 900 metric tons were pre-fabricated on-site at a temporary pre-casting plant installed on an adjacent jetty. The units were then delivered to their final location using a custom-built gantry mounted on a large catamaran barge. The accelerated construction strategy was key to meeting the delivery schedule.


Conclusion


Accelerated techniques for bridge construction should be used where the benefits have effects on the construction costs. This modern technology was used to implement innovative planning, design, materials, and construction methods in a safe and cost-effective manner to reduce on-site construction. Decisions to use accelerated bridge construction techniques were made after considering the specific factors, mainly temporary roadways, temporary retaining structures, environmental impacts, sustainable development, user costs, social and financial prerogatives. In this article, the author has selected several bridge structures where the Accelerated Bridge Construction techniques were applied.


A featured contribution from Leadership Perspectives: a curated forum reserved for leaders nominated by our subscribers and vetted by the Construction Business Review Advisory Board.

The Leadership Perspectives forum brings together voices shaping the construction industry. Participation is by invitation only. It features leaders who are not merely observing industry changes, but actively contributing to them through operational expertise and project execution insights.

EDITOR'S CHOICE
  • CUSHMAN & WAKEFIELD [NYSE: CWK] Projects Today Come Down to Nerves of Steel and Realistic Expectations Jason D’Orlando, Senior Managing Director, and Michael Morehead, Senior Director, Project and Development Services - Industrial, Cushman & Wakefield [NYSE: CWK]
  • WALMART [NYSE: WMT] Navgating the Challenges and Innovations in Mega Construction Projects: Building Competent Leadership and Embracing Technological Trends Seth Roy, Senior Director - Design & Construction, Walmart [NYSE: WMT]
  • MERITAGE HOMES Act Now to Address Aging Workforce Poli Peters, VP of Operations, Meritage Homes [NYSE: MTH]
  • ADVANCED DRAINAGE SYSTEMS [NYSE: WMS] Walking the sustainability walk: The case for EPR Brian King, EVP Marketing, Product Management and Sustainability, Advanced Drainage Systems, Inc. [NYSE: WMS]
  • TOLL BROTHERS [NYSE: TOL] Transforming Construction: Overcoming Challenges And Embracing Technological Trends Korey Herndon, Safety Director, Toll Brothers
  • PORTLAND GENERAL ELECTRIC [NYSE: POR] The Future of Construction Management Ken Pitta, Senior Construction Manager, Portland General Electric [NYSE: POR]
  • BRIXMOR PROPERTY GROUP [NYSE: BRX] Navigating the Landscape of Retail Project Management: Strategies for Success T.J. McKeever, Senior Project Manager, Brixmor Property Group
Copyright © 2026 Construction Business Review All rights reserved. |  Subscribe |  Newsletter |  Sitemap |  About us|  Editorial Policy|  Feedback Policyfollow on linkedin
This content is copyright protected

However, if you would like to share the information in this article, you may use the link below:

https://www.constructionbusinessrevieweurope.com/cxoinsight/accelerated-bridge-construction-techniques-using-prefabricated-and-preassembled-structural-systems-nwid-198.html

We use cookies on this website to enhance your user experience. By clicking any link on this page you are giving your consent for us to set cookies. More info

I agree